1995-1998 Chevy / GMC C/K 6.5L Turbo Diesel Install Guide

1995-1998 INSTALLATION GUIDE GlowShift.com © GlowShift Gauges, LLC | All Rights Reserved 6.5L TURBO DIESEL 8 1. Now that all of your gauges are mounted, sensors and fittings are installed to their sources and their secured sensor wires are ran to the driver’s side of the engine bay, route the wires through the firewall and into the cab of the truck, keeping clear of any moving parts. Note: You may need to drill a hole in the firewall if there isn’t one already. It is important to use a Grommet on the hole to ensure the wires are not sliced or cut on the firewall. 2. Run the sensor wires and the Boost Line up to the A-pillar location. 3. Insert the line into the Ferrule Fitting Adapter and thread onto the back of the gauge and tighten with a 3/8” Wrench. (Refer to diagram below) 4. Route the EGT Probe Harness and connect to the back of the Pyrometer EGT Gauge. 5. Connect the wire from the Transmission Temperature Sensor to the green wire on the back of the Transmission Temperature Gauge using a Butt Connector. 6. Route the Fuel Pressure Sensor Harness and connect to the back of the Fuel Pressure Gauge. 7. Reinstall the pillar pod. Mounting The Pillar Pod SECTION 7 3. 5. 8. PROPER ORIENTATION

RkJQdWJsaXNoZXIy MTIxODAy