1995-1998 Chevy / GMC C/K 6.5L Turbo Diesel Install Guide

1995-1998 INSTALLATION GUIDE 7 GlowShift.com © GlowShift Gauges, LLC | All Rights Reserved 6.5L TURBO DIESEL Preparing The Pillar Pod SECTION 6 1. Place the Triple Pillar Pod on top of the factory A-pillar trim. Using a marker, note placement of where the wires will pass through the A-pillar. 2. Using a Step Bit, drill the 3 holes for the gauge wires to pass through. 3. Drill (4) 7/32” holes in the respective corners of the pod and A-pillar trim and secure using the provided push-in fasteners. 4. Mount the gauges in the Triple Pillar Pod. No specific order is required. 5. This step features the use of GlowShift’s 3 Gauge Wiring Kit (Optional): Using the yellow wire from the wiring harness, connect all of the yellow wires together; using the red wire from the wiring harness, connect all of the red wires together; using the orange wire from the wiring harness, connect all of the orange wires together; using the black wire from the wiring harness, connect all of the black wires together. 6. Wrap Teflon Tape clockwise on the fitting located on the back of the Boost Gauge. This will ensure a leak-free connection. 7. Secure wiring with Zip Ties. 2. 4. 5.

RkJQdWJsaXNoZXIy MTIxODAy