2008-2010 Ford Super Duty 6.4L Power Stroke GlowShift Gauges Installation Guide

GlowShift.com © GlowShift Gauges, LLC | All Rights Reserved 2 2008-2010 INSTALLATION GUIDE FORD SUPER DUTY POWER STROKE 7. Thread and tighten the male end of the boost line fitting into the threaded hole using an 11mm wrench. 8. Insert the boost line fitting cap on the boost line followed by the ferrule. 9. Insert the boost line into the boost line fitting and tighten the cap with a 3/8” wrench. (Refer to diagram below) Note: Do not overtighten. 10. Reinstall the throttle body using an 8mm socket and plug in the electrical connection. 11. Reinstall the intercooler pipe coupler to the throttle body and tighten the clamps with an 11mm socket. 12. Route the boost line to an opening on the firewall on the driver’s side of the engine bay and use Zip Ties to secure. Make sure there is no contact with any direct heat source or moving parts of the truck. 11. 7. 9. PROPER ORIENTATION

RkJQdWJsaXNoZXIy MTIxODAy