GlowShift | 1994-1997 Dodge Ram Cummins 12v Installation Guide

1994-1997 INSTALLATION GUIDE GlowShift.com © GlowShift Gauges, LLC | All Rights Reserved DODGE RAM 12V CUMMINS 6 1. Now that all of your gauges are mounted, you can proceed with the installation of your pillar pod. 2. Remove the lower dash panel using a Phillips head screwdriver in order to cleanly route the wires. 3. Route the wires and boost line through the firewall and into the cab of the truck, keeping clear of any moving parts. Note: You may need to drill a hole in the firewall if there isn’t one already. It is important to use a grommet on the hole to ensure the wires are not sliced or cut on the firewall. 4. Insert the boost line into the ferrule fitting adapter, thread onto the back of the gauge and tighten with a 3/8” wrench. (Refer to diagram below) Note: Do not overtighten the Ferrule Fitting. 5. Plug the EGT Sensor Harness into the back of the EGT Gauge. (If used) 6. Plug the Fuel Pressure Sensor Harness into the back of the Fuel Pressure Gauge. (If used) 7. Splice the green signal wire from the Transmission Temperature Gauge to the white signal wire from the sensor. (If used) 8. Mount the pillar pod and factory trim assembly to the truck cab A-pillar, securing it with the factory spring clips. Mounting the Pillar Pod SECTION 6 2. 3. 4. PROPER ORIENTATION

RkJQdWJsaXNoZXIy MTIxODAy